Independent metallurgical consultancy

Independent metallurgical advice for smelter performance, project review and operational recovery.

Dr Samir Ganguly advises plant owners and project teams on manganese ferroalloys, furnace operations, technical due diligence and process improvement, backed by a career spanning more than five decades.

  • PhD Metallurgical Engineering
  • Career beginning 1970
  • TEMCO / BHP / South32
  • Hatch / ELKEM
  • International project experience

Advisory services

Focused technical input where operating and investment decisions meet.

Engagements are shaped around a defined plant problem, decision or review mandate.

01

Smelter diagnosis and recovery

Independent diagnosis of unstable production, throughput constraints, ore variability and recovery priorities.

Service detail
02

Technical due diligence

Senior metallurgical review for feasibility, asset assessment, restructuring and capital decisions.

Service detail
03

Furnace and refractory review

Review of loading, lining philosophy, freeze lining, electrode practice, tapping and equipment life.

Service detail
04

Raw materials and process evaluation

Ore, reductant and process-route evaluation linked to plant constraints, product requirements and economics.

Service detail

Selected operating outcomes

Results from furnace, sinter and copper-smelter assignments.

A selection of quantified outcomes across hands-on operating, leadership and consulting roles.

Technical illustration of a metallurgical furnace cross-section and material flow
  1. 60 to 180 kt/yr

    Manganese sinter production

    ELKEM Sauda, Norway - 1994

  2. 2x

    M14 furnace production

    Metalloys, South Africa - 2017 to 2019

  3. 5 weeks / 12 planned

    Furnace 1 reline

    TEMCO, Bell Bay

  4. 22 to 30 to 38 MW

    Electric furnace loading

    ZCCM, Mufulira - 1979 to 1983

  5. +30%

    Copper anode output

    ZCCM, Mufulira - 1986 to 1987

Selected advisory studies

Scale assessed, not outcomes claimed.

Roadmap target
30,000 to 100,000 t
Silicomanganese capacity roadmap
Taraz, Kazakhstan
Roadmap target
0.9 to 0.6
Slag-to-alloy ratio roadmap
High-carbon ferromanganese
Concept-study basis
100,000 t
Greenfield silicomanganese smelter
Process, equipment, layout, opex and capex

Experience

A metallurgical career spanning more than five decades, beginning in 1970.

1991 - PhD, Metallurgical Engineering
The University of Queensland, Australia

1970 - B.Tech (Honours), Metallurgical Engineering
Indian Institute of Technology Madras, India

  1. 2021-Feb 2025

    Liberty Bell Bay

    Bell Bay, Australia

    Contract project metallurgist

  2. 2012-2021

    TEMCO / South32 and South32 Manganese

    Australia and South Africa

    Project metallurgy, technical audits and process improvement

  3. 2008-2014

    Hatch

    Brisbane, Australia

    Principal pyrometallurgical specialist

  4. 1988-2008

    TEMCO / BHP / Billiton / BHP Billiton

    Bell Bay, Australia

    Production metallurgy through smelting and technology management

  5. 1979-1987

    ZCCM / The University of Queensland

    Zambia and Australia

    Copper-smelter roles, with PhD research from 1983 to 1985

  6. 1970-1979

    Indian Iron and Steel Co.

    Burnpur, India

    Steel melting shop production and shift leadership

Review professional credentials

Research-backed practice

Plant experience supported by a public technical record.

Peer-reviewed work with UNSW collaborators connects manganese-ore reduction, silicomanganese chemistry and slag-carbon reactions with decades of operating practice.

UNSW collaboration

Research with Professor Oleg Ostrovski and collaborators on manganese ore reduction, silicomanganese chemistry and slag-carbon reactions.

Named co-inventor

Named on the EP1230407 patent family for solid-state reduction of oxides.

Industry contribution

AIST lists a Bell Bay production-history presentation; INFACON X lists Dr Ganguly among its referees.

Professional credentials

Qualifications, career chronology, project scope and selected publications.

View credentials

Contact

Start with the technical decision in front of you.

Share the asset, location and question that needs review. Initial contact is by email.

samir.ganguly49@gmail.com

Project enquiry

Name, email and message are required.

Please do not include confidential plant or commercial information in an initial enquiry.